This project involved underpinning, structural work, forming, blindside waterproofing, and bathtub waterproofing.
Our team used WR Meadows Pre-Con system with Hydralastic 836 pointing mastic. The blindside waterproofing is carried underneath the footing and along the main slab.
These systems require a perfect substrate to be executed correctly. Each step was witnessed by the manufacturer and a 3rd party engineering.